• Title of article

    A Time Dependent Pollution Routing Problem in Multi-graph

  • Author/Authors

    Setak, M. Department of Industrial Engineering - K. N. Toosi University of Technology, Tehran , Shakeri, Z. Department of Industrial Engineering - K. N. Toosi University of Technology, Tehran , Patoghi, A. Department of Industrial Engineering - K. N. Toosi University of Technology, Tehran

  • Pages
    9
  • From page
    234
  • To page
    242
  • Abstract
    This paper considers a time dependent(the travel time is not constant throughout the day) pollution routing problem (TDPRP), which aids the decision makers in minimizing travel time, toll cost and emitted pollution cost. In complexity of urban areas most of the time one point is accessible from another with more than one edge. In contrast to previous TDPRP models, which are designed with only one edge between two nodes, the existence of more than one edge between two nodes is allowed in our modeling. Thus we develop a new model that is called time dependent pollution routing problem in multi-graph (TDPRPM). Since the problem is NP-hard, a tabu search (TS) algorithm is developed to solve it. Finally, computational results of tabu search procedure and its comparison to exact solution are presented.
  • Keywords
    Time – dependent , Pollution Routing Problem , Multi-graph , Tabu Search
  • Journal title
    International Journal of Engineering
  • Serial Year
    2017
  • Record number

    2507390