• Title of article

    A new Version of Earned Value Analysis for Mega Projects Under Interval-Valued Fuzzy Environment

  • Author/Authors

    Moradi, N Department of Industrial Engineering - Faculty of Engineering - Shahed University, Tehran , Mousavi, Meysam Department of Industrial Engineering - Faculty of Engineering - Shahed University, Tehran , Vahdani, Behnam Faculty of Industrial & Mechanical Engineering - Qazvin Branch - Islamic Azad University, Qazvin

  • Pages
    16
  • From page
    57
  • To page
    72
  • Abstract
    The earned value technique is a crucial and important technique in analysis and control the performance and progress of mega projects by integrating three elements of them, i.e., time, cost and scope. This paper proposes a new version of earned value analysis (EVA) to handle uncertainty in mega projects under interval-valued fuzzy (IVF)-environment. Considering that uncertainty is very common in mega projects‟ activities, the proposed IVF-EVA model is very useful and applicable in evaluating the progress of projects. In this paper, analyzing earned value indices and calculating them with linguistic terms have been discussed. They are then converted into interval-valued fuzzy numbers (IVFNs) for the evaluations. Finally, an application example from the recent literature is presented and steps of the proposed IVF-EVA are elaborated.
  • Keywords
    Earned value analysis , mega projects , interval-valued fuzzy sets , interval-valued earned value indices
  • Journal title
    Journal of Optimization in Industrial Engineering
  • Serial Year
    2020
  • Record number

    2523723