Title of article
A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequencedependent setup times and release dates
Author/Authors
Gharehgozli, A. H. university of tehran - Faculty of Engineering - Department of Industrial Engineering, تهران, ايران , Tavakkoli-Moghaddam, R. university of tehran - Faculty of Engineering - Department of Industrial Engineering, تهران, ايران , Rabbani, M. university of tehran - Faculty of Engineering - Department of Industrial Engineering, تهران, ايران , Zaerpour, N. university of tehran - Faculty of Engineering - Department of Industrial Engineering, تهران, ايران
From page
38
To page
47
Abstract
This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the complexity of the above model and uncertainty involved in real-world scheduling problems, it is sometimes unrealistic or even impossible to acquire exact input data. Hence, we consider the parallel-machine scheduling problem with sequence-dependent set-up times under the hypothesis of fuzzy processing time s knowledge and two fuzzy objectives as the MIGP model. In addition, a quite effective and applicable methodology for solving the above fuzzy model is presented. At the end, the effectiveness of the proposed model and the denoted methodology is demonstrated through some test problems.
Keywords
Parallel machine scheduling , Mixed , integer goal programming , Fuzzy theory , sequencedependent setup time , Release date
Journal title
Journal of Industrial Engineering International
Journal title
Journal of Industrial Engineering International
Record number
2584813
Link To Document