Title of article
Applying a Technical-Economic Approach to Calculate a Suitable Panel Width for Longwall Mining Method
Author/Authors
Aghababaei, Sajjad Department of oil and gas - Faculty of engineering - Shahid Bahonar University of Kerman - Kerman, Iran , Jalalifar, Hossein Department of oil and gas - Faculty of engineering - Shahid Bahonar University of Kerman - Kerman, Iran , Hosseini, Ali Faculty of Mining and Metallurgical Engineering - Yazd University - Yazd, Iran
Pages
14
From page
113
To page
126
Abstract
Providing an approach to calculate a suitable panel width for the longwall mining
method is considered considering both the technical and economic factors. Based on
the investigations carried out, a technical-economic model is proposed to calculate a
suitable panel width. The proposed model is a combination of the rock engineering
system-based model and the technical relationships to estimate the expected actual face
advance rate of the longwall panel and also the economic relationships to determine
the operational costs. Applying the technical conditions to the presented model is
conducted by the vulnerability index of the advancing operation, which considers the
face advance rate as the main important factor that controls the operational costs of the
longwall face. The performance evaluation of the presented model is possible by the
recordable field data, which is one of its advantages. This process is carried out by a
case study, and the results obtained indicate that the developed approach can provide
an applicable tool to calculate a suitable panel width.
Keywords
Suitable panel width , Face advance rate , Technical-economic model , Rock engineering systems , Longwall mining
Journal title
Journal of Mining and Environment
Serial Year
2021
Record number
2686826
Link To Document