Title of article
Scheduling approach for concurrent product development processes
Author/Authors
Wu، Cheng-Tai نويسنده , , Yan، Ji-Hong نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2001
Pages
-138
From page
139
To page
0
Abstract
A heuristic scheduling approach is proposed for the concurrent product development processes, in which some crucial parameters are determined using the genetic algorithm (GA). Scheduling concurrent activities is of great significance to shorten development lead-time and minimize costs, since it can eliminate unnecessary redesign periods and guarantee that serial activities can be executed as concurrently as possible. To ensure the optimal concurrent scheduling and the effective utilization of resources along with efficient delivery of information, some key factors such as time order, information, resources, lead-time and overlapping time of activities, which enable concurrent activities to be executed successfully, are taken into account. Their weighting factors are fixed by the GA. In addition, the scheduling module includes role allocation and feedback revision. A simulation example, which is part of an aircraft product development process, shows the feasibility of the algorithm.
Keywords
Rule induction , Rough sets , Genetic algorithms
Journal title
COMPUTERS IN INDUSTRY
Serial Year
2001
Journal title
COMPUTERS IN INDUSTRY
Record number
35215
Link To Document