• Title of article

    Operational tests on HVDC thyristor modules in a synthetic test circuit for the Sylmar East Restoration Project

  • Author/Authors

    Bauer، نويسنده , , T.، نويسنده , , Lips، نويسنده , , H.P.، نويسنده , , Thiele، نويسنده , , G.، نويسنده , , Tylutki، نويسنده , , T.، نويسنده , , Uder، نويسنده , , M.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 1997
  • Pages
    8
  • From page
    1151
  • To page
    1158
  • Abstract
    According to IEC 700 and IEEE 857, operational tests on HVDC thyristor modules can be performed either in a six-pulse back-to-back test circuit or in a qynthetic test circuit. Because of the high rating of modern thyristors the use of a sixpulse bridge configuration would require facilities with a high installed capacity. In a synthetic test circuit even high current and voltage stresses can be represented using less than U100 of that installed capacity. Thus synthetic test circuits are an economical alternative to test a representative part of a modern thyristor valve. The paper describes the operational tests on thyristor modules for the Sylmar East Restoration Project wlhich were completely carried out in a synthetic test circuit.
  • Journal title
    IEEE TRANSACTIONS ON POWER DELIVERY
  • Serial Year
    1997
  • Journal title
    IEEE TRANSACTIONS ON POWER DELIVERY
  • Record number

    399439