Title of article
Hierarchical approach for production planning and scheduling under uncertainty
Author/Authors
Dan Wu، نويسنده , , Marianthi Ierapetritou، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2007
Pages
12
From page
1129
To page
1140
Abstract
In this paper, the simultaneous solution of production planning and scheduling problem is addressed through a hierarchical framework. The planning problem aggregates orders in the planning period and considers uncertainty utilizing a multi-stage stochastic programming formulation where three stages are considered with increasing level of uncertainty. The planning model includes material balances and time horizon constraints which involve a sequence factor to reflect the recipe complexity. Using a rolling horizon strategy, the production for the current stage is provided to the scheduling problem, which is solved using a continuous-time formulation. An iterative framework is developed to converge the planning and scheduling results before solving for the next period. The proposed approach is illustrated with a planning case study.
Keywords
Scheduling , Multi-stage optimization , Uncertainty , Hierarchical , production planning
Journal title
Chemical Engineering and Processing: Process Intensification
Serial Year
2007
Journal title
Chemical Engineering and Processing: Process Intensification
Record number
418513
Link To Document