Title of article
A measurement methodology for monitoring a CHCP pilot plant for an office building
Author/Authors
E. Cardona، نويسنده , , A. Piacentino، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2003
Pages
7
From page
919
To page
925
Abstract
In Mediterranean areas, climate conditions determine quite equal demand both for thermal and cooling energy. The possibility to convert a cooling demand in thermal one through an absorption chiller allows to extend widely the number of running hours of a cogeneration plant. A trigeneration pilot plant for two office building is described, in which an integrated lay-out includes a NG prime mover with heat exchanger, an absorption chiller and a reversible heat pump. The pilot plant is completed and pre-running test were performed. Different fluid dynamics parameters will be monitored, in order to build the actual cumulative curve for thermal power. The measurement methodology is also illustrated. Data obtained will help not only to choose a plant management criterium, but also to put into evidence relations between shapes of consumption curves and most suitable project variables, as to make this pilot plant a best experience for CHCP applications.
Keywords
CHCP pilot plant , Cogeneration plant , Consumption curves
Journal title
Energy and Buildings
Serial Year
2003
Journal title
Energy and Buildings
Record number
419402
Link To Document