• Title of article

    Rights to Capacity: Transitional Protection for Existing Utility Customers

  • Author/Authors

    Roger L. Conkling، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 1995
  • Pages
    10
  • From page
    74
  • To page
    83
  • Abstract
    Capacity rights, a key issue in FERCʹs restructuring of gas pipelines, seem to be overlooked in the California PUCʹs vision for an electric future. This article suggests how the FERC precedent could be applied to electric generation and transmission, filling the voids in the California plan and providing a take-off point for ultimate restructuring.
  • Journal title
    The Electricity Journal
  • Serial Year
    1995
  • Journal title
    The Electricity Journal
  • Record number

    431944