Title of article
Seven basic rules for the PBR regulator
Author/Authors
Peter Navarro، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 1996
Pages
7
From page
24
To page
30
Abstract
The California PBR experience in the case of San Diego Gas & Electric Co. should serve as a model for every other regulatory commission in the nation on how not to use PBR. This case shows that a poorly designed and administered PBR may defeat the goal of improving economic competitiveness and, through its failure, slow the pace of needed reform.
Journal title
The Electricity Journal
Serial Year
1996
Journal title
The Electricity Journal
Record number
432077
Link To Document