• Title of article

    Seven basic rules for the PBR regulator

  • Author/Authors

    Peter Navarro، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 1996
  • Pages
    7
  • From page
    24
  • To page
    30
  • Abstract
    The California PBR experience in the case of San Diego Gas & Electric Co. should serve as a model for every other regulatory commission in the nation on how not to use PBR. This case shows that a poorly designed and administered PBR may defeat the goal of improving economic competitiveness and, through its failure, slow the pace of needed reform.
  • Journal title
    The Electricity Journal
  • Serial Year
    1996
  • Journal title
    The Electricity Journal
  • Record number

    432077