• Title of article

    25 years of experience in operating thermal desalination plants

  • Author/Authors

    Kershman، S. A. نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2001
  • Pages
    -140
  • From page
    141
  • To page
    0
  • Abstract
    Thermal desalination plants have been operating in Libya since 1975. Over this period, the total installed capacity has grown to more than 330,000m3/d. Of this, more than 300,000m3/d are produced by multi-stage flash (MSF) and the rest by multi-effect distillation (MED). This paper described a complete survey of all installed thermal desalination plants which are operated by The General Electric Company of Libya (GECOL) from 1975 to 2000, and also describes the problems encountered in the past and adapted solutions for some of these problems.
  • Keywords
    Chloride stress corrosion cracking , AL-6XN® , UNS N08367 , 6% Mo stainless steel , Superaustenitic stainless steel
  • Journal title
    Desalination
  • Serial Year
    2001
  • Journal title
    Desalination
  • Record number

    54070