Title of article
A new improved genetic algorithm approach and a competitive heuristic method for large-scale multiple resource-constrained project-scheduling problems
Author/Authors
KHANZADI، MOSTAFA نويسنده , , Soufipour، Rambod نويسنده , , Rostami، Mohammad نويسنده ,
Issue Information
دوفصلنامه با شماره پیاپی 6 سال 2011
Pages
12
From page
737
To page
748
Abstract
The aim of this paper is to present a new genetic algorithm approach for large scale multiple resource-constrained project-scheduling problems (RCPSP). It also presents a heuristic approach to achieve proper solutions for large scale problems. This research area is very common in industry especially when a set of activities needs to be finished as soon as possible subject to two sets of constraints, precedence constraints and resource constraints. The emphasis in this research is on investigating the complexity of scheduling problems and developing a new GA approach to solve this problem in such a way that the advantages of GA are appropriately utilized by applying a novel method to reduce the complexity of the problem. Computational results are also reported for the most famous classical problems taken from the operational research literature.
Journal title
International Journal of Industrial Engineering Computations
Serial Year
2011
Journal title
International Journal of Industrial Engineering Computations
Record number
655807
Link To Document