• Title of article

    Grinding Circuit at Mouteh Gold Mine

  • Author/Authors

    بابايي الموتي، م نويسنده , , رضايي، ب نويسنده , , نوع پرست ، م نويسنده ,

  • Issue Information
    دوفصلنامه با شماره پیاپی 0 سال 2011
  • Pages
    6
  • From page
    71
  • To page
    76
  • Abstract
    This study was conducted in Mouteh grinding circuit. Mouteh gold processing plant is located in Esfahan province,center of Iran, close to Mouteh open pit mine. One of the main problems in this circuit is low efficiency grinding operation. In this study, first grinding circuit and its performance parameters are evaluated. Laboratory and corrected operating Bond work index subsequently were calculated to be 16.8 and 21.47 (kwh/t), respectively. Bond efficiency factor then estimated to be 78.24%. Low value of this index means that the grinding operation is inefficient. Finally, efficiency of hydrocyclones evaluated and its cut size was calculated to be 85 microns.
  • Journal title
    Amirkabir International Journal of Modeling,Identification,Simulation and Control
  • Serial Year
    2011
  • Journal title
    Amirkabir International Journal of Modeling,Identification,Simulation and Control
  • Record number

    662004