• Title of article

    Probable maximum precipitation 24 hours estimation: A case study of Zanjan province of Iran

  • Author/Authors

    Shirdeli ، Azim نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی 10 سال 2012
  • Pages
    6
  • From page
    2237
  • To page
    2242
  • Abstract
    One of the primary concerns in designing civil structures such as water storage dams and irrigation and drainage networks is to find economic scale based on possibility of natural incidents such as floods, earthquake, etc. Probable maximum precipitation (PMP) is one of well known methods, which helps design a civil structure, properly. In this paper, we study the maximum one-day precipitation using 17 to 50 years of information in 13 stations located in province of Zanjan, Iran. The proposed study of this paper uses two Hershfield methods, where the first one yields 18.17 to 18.48 for precipitation where the PMP24 was between 170.14 mm and 255.28 mm. The second method reports precipitation between 2.29 and 4.95 while PMP24 was between 62.33 mm and 92.08 mm. In addition, when the out of range data were deleted from the study of the second method, precipitation rates were calculated between 2.29 and 4.31 while PMP24 was between 76.08 mm and 117.28 mm. The preliminary results indicate that the second Hershfield method provide more stable results than the first one.
  • Journal title
    Management Science Letters
  • Serial Year
    2012
  • Journal title
    Management Science Letters
  • Record number

    680256