• Title of article

    Optimal constrained non-renewable resource allocation in PERT networks with discrete activity times

  • Author/Authors

    Hashemin، S.S نويسنده , , Fatemi Ghomi، S.M.T. نويسنده Professor, Department of Industrial Engineering, Tehran, Iran, , , Modarres، M. نويسنده ,

  • Issue Information
    دوماهنامه با شماره پیاپی 53 سال 2012
  • Pages
    8
  • From page
    841
  • To page
    848
  • Abstract
    In this paper, we develop an approach to optimally allocate a limited nonrenewable resource among the activities of a project, represented by a PERT-Type Network (PTN). The project needs to be completed within some specified due date. The objective is to maximize the probability of project completion on time. The duration of each activity is an arbitrary discrete random variable and also depends on the amount of consumable resource allocated to it. On the basis of the structure of networks, they are categorized as either reducible or irreducible. For each network structure, an analytical algorithm is presented. Through some examples, the algorithms are illustrated.
  • Journal title
    Scientia Iranica(Transactions E: Industrial Engineering)
  • Serial Year
    2012
  • Journal title
    Scientia Iranica(Transactions E: Industrial Engineering)
  • Record number

    682837