Title of article
Optimal constrained non-renewable resource allocation in PERT networks with discrete activity times
Author/Authors
Hashemin، S.S نويسنده , , Fatemi Ghomi، S.M.T. نويسنده Professor, Department of Industrial Engineering, Tehran, Iran, , , Modarres، M. نويسنده ,
Issue Information
دوماهنامه با شماره پیاپی 53 سال 2012
Pages
8
From page
841
To page
848
Abstract
In this paper, we develop an approach to optimally allocate a limited nonrenewable resource
among the activities of a project, represented by a PERT-Type Network (PTN). The project needs to
be completed within some specified due date. The objective is to maximize the probability of project
completion on time. The duration of each activity is an arbitrary discrete random variable and also depends
on the amount of consumable resource allocated to it. On the basis of the structure of networks, they
are categorized as either reducible or irreducible. For each network structure, an analytical algorithm is
presented. Through some examples, the algorithms are illustrated.
Journal title
Scientia Iranica(Transactions E: Industrial Engineering)
Serial Year
2012
Journal title
Scientia Iranica(Transactions E: Industrial Engineering)
Record number
682837
Link To Document