Title of article
Scheduling in flexible job-shop manufacturing system by improved tabu search
Author/Authors
Abbas Toloie Eshlaghy، نويسنده , , Seyed Ahmad Sheibatolhamdy، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2011
Pages
10
From page
4863
To page
4872
Abstract
In modern manufacturing and production systems, flexibility has increased as a response mechanism toward changes. In such systems, a piece may have several flexible process programs. In this study, scheduling problem in flexible job-shop manufacturing production systems is studied with minimization objective function of make span (Cmax ) "and" average time in completion of pieces (C ) that is consistent with, just in time philosophy and management objectives of supply chain. Concerning problem being NP-hard, heuristic method is proposed to solve it based on tabu search algorithm which is compared with a hierarchical method. Performance criteria for comparison are "response quality" and "calculation time" in which results of numerical test approve the priority of tabu search algorithm in comparison to hierarchical method.
Keywords
Scheduling , Tabu search , meta-heuristics , Flexibility , Job-shop , Sequencing
Journal title
African Journal of Business Management
Serial Year
2011
Journal title
African Journal of Business Management
Record number
686757
Link To Document