• Title of article

    Dry kiln scheduling in furniture production

  • Author/Authors

    HODGSON، THOM J. نويسنده , , YAGHUBIAN، ARMAN R. نويسنده , , JOINES، JEFFREY A. نويسنده , , CULBRETH، C. THOMAS نويسنده , , HUANG، J.C. نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 1999
  • Pages
    -732
  • From page
    733
  • To page
    0
  • Abstract
    In this paper, a dry kiln scheduling problem from the furniture manufacturing industry is considered. Factory-specified due dates for orders, kiln availability, kiln capacity, and travel time from the kilns to the factories are all incorporated in a model which is formulated as an integer linear program. The objective of the formulation is to minimize the maximum tardiness of orders arriving at the plants by solving a special case of scheduling n independent jobs on m non-identical parallel machines. Because of the computational complexity, and the fact that standard integer programming packages appear to perform very poorly on the problem, a heuristic approach is developed. Computational experience is provided which indicates that the heuristic gives very high quality solutions to problems in near real-time.
  • Keywords
    Aliquat 336 , PALLADIUM , LIX 63 , Extraction kinetics
  • Journal title
    IIE TRANSACTIONS
  • Serial Year
    1999
  • Journal title
    IIE TRANSACTIONS
  • Record number

    8102