• Title of article

    Scheduling with unexpected machine breakdowns Original Research Article

  • Author/Authors

    Susanne Albers، نويسنده , , Günter Schmidt، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2001
  • Pages
    15
  • From page
    85
  • To page
    99
  • Abstract
    We investigate an online version of a basic scheduling problem where a set of jobs has to be scheduled on a number of identical machines so as to minimize the makespan. The job processing times are known in advance and preemption of jobs is allowed. Machines are non-continuously available, i.e., they can break down and recover at arbitrary time instances not known in advance. New machines may be added as well. Thus machine availabilities change online. We first show that no online algorithm can construct optimal schedules. We also show that no online algorithm can achieve a bounded competitive ratio if there may be time intervals where no machine is available. Then we present an online algorithm that constructs schedules with an optimal makespan of CmaxOPT if a lookahead of one is given, i.e., the algorithm always knows the next point in time when the set of available machines changes. Finally, we give an online algorithm without lookahead that constructs schedules with a nearly optimal makespan of CmaxOPT+ε, for any ε>0, if at any time at least one machine is available. Our results demonstrate that not knowing machine availabilities in advance is of little harm.
  • Keywords
    Scheduling , Machine breakdown , Online algorithm , Lookahead
  • Journal title
    Discrete Applied Mathematics
  • Serial Year
    2001
  • Journal title
    Discrete Applied Mathematics
  • Record number

    885212