• Title of article

    Scheduling workover rigs for onshore oil production Original Research Article

  • Author/Authors

    Dario J. Aloise، نويسنده , , Daniel Aloise، نويسنده , , Caroline T.M. Rocha، نويسنده , , Celso C. Ribeiro، نويسنده , , José C. Ribeiro Filho، نويسنده , , Luiz S.S. Moura، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2006
  • Pages
    8
  • From page
    695
  • To page
    702
  • Abstract
    Many oil wells in Brazilian onshore fields rely on artificial lift methods. Maintenance services such as cleaning, reinstatement, stimulation and others are essential to these wells. These services are performed by workover rigs, which are available on a limited number with respect to the number of wells demanding service. The decision of which workover rig should be sent to perform some maintenance service is based on factors such as the well production, the current location of the workover rig in relation to the demanding well, and the type of service to be performed. The problem of scheduling workover rigs consists in finding the best schedule for the available workover rigs, so as to minimize the production loss associated with the wells awaiting for service. We propose a variable neighborhood search (VNS) heuristic for this problem. Computational results on real-life problems are reported and their economic impacts are evaluated.
  • Keywords
    Workover rigs , Oil production , Heuristics , Combinatorial optimization , VNS
  • Journal title
    Discrete Applied Mathematics
  • Serial Year
    2006
  • Journal title
    Discrete Applied Mathematics
  • Record number

    886231