Title of article
Scheduling workover rigs for onshore oil production Original Research Article
Author/Authors
Dario J. Aloise، نويسنده , , Daniel Aloise، نويسنده , , Caroline T.M. Rocha، نويسنده , , Celso C. Ribeiro، نويسنده , , José C. Ribeiro Filho، نويسنده , , Luiz S.S. Moura، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2006
Pages
8
From page
695
To page
702
Abstract
Many oil wells in Brazilian onshore fields rely on artificial lift methods. Maintenance services such as cleaning, reinstatement, stimulation and others are essential to these wells. These services are performed by workover rigs, which are available on a limited number with respect to the number of wells demanding service. The decision of which workover rig should be sent to perform some maintenance service is based on factors such as the well production, the current location of the workover rig in relation to the demanding well, and the type of service to be performed. The problem of scheduling workover rigs consists in finding the best schedule for the available workover rigs, so as to minimize the production loss associated with the wells awaiting for service. We propose a variable neighborhood search (VNS) heuristic for this problem. Computational results on real-life problems are reported and their economic impacts are evaluated.
Keywords
Workover rigs , Oil production , Heuristics , Combinatorial optimization , VNS
Journal title
Discrete Applied Mathematics
Serial Year
2006
Journal title
Discrete Applied Mathematics
Record number
886231
Link To Document