• Title of article

    Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time

  • Author/Authors

    Harun Aydilek a، نويسنده , , Ali Allahverdi، نويسنده ,

  • Issue Information
    دوهفته نامه با شماره پیاپی سال 2010
  • Pages
    10
  • From page
    684
  • To page
    693
  • Abstract
    We consider the two-machine flowshop scheduling problem where jobs have random processing times which are bounded within certain intervals. The objective is to minimize total completion time of all jobs. The decision of finding a solution for the problem has to be made based on the lower and upper bounds on job processing times since this is the only information available. The problem is NP-hard since the special case when the lower and upper bounds are equal, i.e., the deterministic case, is known to be NP-hard. Therefore, a reasonable approach is to come up with well performing heuristics. We propose eleven heuristics which utilize the lower and upper bounds on job processing times based on the Shortest Processing Time (SPT) rule. The proposed heuristics are compared through randomly generated data. The computational analysis has shown that the heuristics using the information on the bounds of job processing times on both machines perform much better than those using the information on one of the two machines. It has also shown that one of the proposed heuristics performs as the best for different distributions with an overall average percentage error of less than one.
  • Keywords
    Random and bounded processing times , Flowshop , Total completion time , Scheduling
  • Journal title
    Computers and Mathematics with Applications
  • Serial Year
    2010
  • Journal title
    Computers and Mathematics with Applications
  • Record number

    921197