    Finite capacity scheduling systems: Performance issues and comparisons

  • Author/Authors

    S. T. (Van) Enns، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 1996
  • Pages
    13
  • From page
    727
  • To page
    739
  • Abstract
    This study examines the flowtime, schedule stability and delivery performance results for finite capacity scheduling (FCS) systems. Two common schedule construction approaches, blocked-time and event-driven, are compared. A production shop simulation model facilitates the testing of these two approaches using either internally or externally specified due dates. Also, various due-date dependent loading rules are used in schedule construction. The results show that using the event-driven schedule construction approach along with internally specified due dates works best. Flowtime, flowtime variability and mean tardiness are lower when comparing the event-driven approach to the blocked-time approach as well as when comparing internally to externally set due dates. Schedule stability results are less consistent, with performance being largely a function of the loading rule when the blocked-time approach is used.
  • Journal title
    Computers & Industrial Engineering
  • Serial Year
    1996
  • Journal title
    Computers & Industrial Engineering
  • Record number

    924458