• Title of article

    A hybrid GA-SA algorithm for just-in-time scheduling of multi-level assemblies

  • Author/Authors

    Anthony Roach، نويسنده , , Rakesh Nagi، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 1996
  • Pages
    14
  • From page
    1047
  • To page
    1060
  • Abstract
    The environment is a manufacturing facility that produces multi-level assemblies in a Just-In-Time (JIT) fashion. The due-dates and lot-sizes of the end-items are given, and the objective is to determine a lot-for-lot operations schedule that minimizes the cumulative production lead-time. The scheduling problem within such an environment is NP-hard, and therefore, the performance of heuristics may vary depending on the specific problem instance. To address this problem an effective hybrid Genetic Algorithm-Simulated Annealing (GA-SA) algorithm is developed. The GA starts with an initial population generated by well known scheduling heuristics, a critical path heuristic, and randomly generated schedules. The scheduling work is shared by the GA and SA in two phases that alternate until convergence: (1) Phase I is the GA that crosses over solutions for different work-centers, and (2) Phase II is the SA that improves the sequence of operations on individual work-centers. The effectiveness of the proposed heuristic is assessed via numerical studies.
  • Journal title
    Computers & Industrial Engineering
  • Serial Year
    1996
  • Journal title
    Computers & Industrial Engineering
  • Record number

    924481