Title of article
Scheduling of an unreliable manufacturing system with nonresumable setups
Author/Authors
Sherman X. Bai، نويسنده , , Mohsen Elhafsi، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 1997
Pages
17
From page
909
To page
925
Abstract
This paper considers the scheduling of a manufacturing system with nonresumable setup changes. The system considered involves an unreliable machine that can produce two part types. The switchover from one part type to the other incurs a given constant setup time. The setups are nonresumable, i.e. after a machine repair completion, a setup decision has to be made. The parts have specified constant processing time and constant demand rate. We give a continuous dynamic programming formulation of the problem, which is solved numerically. The optimal setup switching policies are shown to be hedging corridors. Two heuristics, for the determination of the hedging levels, are provided. We show, through simulation, that the two heuristics exhibit good performance.
Journal title
Computers & Industrial Engineering
Serial Year
1997
Journal title
Computers & Industrial Engineering
Record number
924761
Link To Document