• Title of article

    Scheduling of an unreliable manufacturing system with nonresumable setups

  • Author/Authors

    Sherman X. Bai، نويسنده , , Mohsen Elhafsi، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 1997
  • Pages
    17
  • From page
    909
  • To page
    925
  • Abstract
    This paper considers the scheduling of a manufacturing system with nonresumable setup changes. The system considered involves an unreliable machine that can produce two part types. The switchover from one part type to the other incurs a given constant setup time. The setups are nonresumable, i.e. after a machine repair completion, a setup decision has to be made. The parts have specified constant processing time and constant demand rate. We give a continuous dynamic programming formulation of the problem, which is solved numerically. The optimal setup switching policies are shown to be hedging corridors. Two heuristics, for the determination of the hedging levels, are provided. We show, through simulation, that the two heuristics exhibit good performance.
  • Journal title
    Computers & Industrial Engineering
  • Serial Year
    1997
  • Journal title
    Computers & Industrial Engineering
  • Record number

    924761