Title of article
A new heuristic for scheduling the two-stage flowshop with additional resources
Author/Authors
Ewa Figielska، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2007
Pages
14
From page
750
To page
763
Abstract
This paper deals with the problem of preemptive scheduling in a two-stage flowshop with parallel unrelated machines at the first stage and a single machine at the second stage. At the first stage, jobs use some additional resources which are available in limited quantities at any time. The resource requirements are of 0–1 type. The objective is the minimization of makespan. The problem is NP-hard. Heuristic algorithms are proposed which solve to optimality the resource constrained scheduling problem at the first stage of the flowshop, and at the same time, minimize the makespan in the flowshop by selecting appropriate jobs for simultaneous processing. Several rules of job selection are considered. The performance of the proposed heuristic algorithms is analyzed by comparing solutions with the lower bound on the optimal makespan. The extensive computational experiment shows that the proposed heuristic algorithms are able to produce near-optimal solutions in short computational time.
Keywords
Scheduling , Flowshop , Resource constraints , Parallel machines , Linear programming , Heuristics
Journal title
Computers & Industrial Engineering
Serial Year
2007
Journal title
Computers & Industrial Engineering
Record number
925628
Link To Document