• Title of article

    Setup times and fast tracking in resource-constrained project scheduling

  • Author/Authors

    Mario Vanhoucke، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2007
  • Pages
    9
  • From page
    1062
  • To page
    1070
  • Abstract
    Resource-constrained project scheduling with activity pre-emption assumes that activities are allowed to be interrupted and restarted later in the schedule at no extra cost. In the current paper, we extend this pre-emptive scheduling problem with setup times between activity interruptions and the possibility to schedule pre-emptive sub-parts of activities in parallel. The contribution of the paper is twofold. First, we briefly show that an efficient exact branch-and-bound procedure from the literature to solve the resource-constrained project scheduling problem can be easily adapted to cope with our problem extensions. Second, we extensively test the impact of these pre-emptive extensions to the quality of the schedule from a makespan point-of-view.
  • Keywords
    Project scheduling , Setup times
  • Journal title
    Computers & Industrial Engineering
  • Serial Year
    2007
  • Journal title
    Computers & Industrial Engineering
  • Record number

    925649