Title of article
An effective heuristic for flexible job-shop scheduling problem with maintenance activities
Author/Authors
Shijin Wanga، نويسنده , , *، نويسنده , , Jianbo Yu b، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2010
Pages
12
From page
436
To page
447
Abstract
Most production scheduling problems, including the standard flexible job-shop scheduling problem
(FJSP), assume that machines are continuously available. However, in most realistic situations, machines
may become unavailable during certain periods due to preventive maintenance (PM). In this paper, a flexible
job-shop scheduling problem with machine availability constraints is considered. Each machine is
subject to preventive maintenance during the planning period and the starting times of maintenance
activities are either flexible in a time window or fixed beforehand. Moreover, two cases of maintenance
resource constraint are considered: sufficient maintenance resource available or only one maintenance
resource available. To deal with this variant FJSP problem with maintenance activities, a filtered beam
search (FBS) based heuristic algorithm is proposed. With a modified branching scheme, the machine
availability constraint and maintenance resource constraint can be easily incorporated into the proposed
algorithm. Simulation experiments are conducted on some representative problems. The results demonstrate
that the proposed filtered beam search based heuristic algorithm is a viable and effective approach
for the FJSP with maintenance activities.
Keywords
Filtered beam search , Flexible job-shop scheduling problem , Availability constraints , Preventive maintenance
Journal title
Computers & Industrial Engineering
Serial Year
2010
Journal title
Computers & Industrial Engineering
Record number
925953
Link To Document