Title of article
Interim equipment shutdown planning for a wafer fab during economic downturns
Author/Authors
Shu-Hsing Chung، نويسنده , , Ming-Hsiu Hsieh، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2010
Pages
11
From page
819
To page
829
Abstract
Because of the low equipment utilization during periods of economic recession, managers of wafer fabs
are forced to plan equipment shutdowns in order to reduce variable cost and reallocate resources. Unfortunately,
few studies have proposed effective solutions for equipment shutdown planning in response to
economic downturns. Taking into consideration the product mix, corresponding output target, excessive
capacity, production performance impact and the variable cost savings, this paper presents a new mechanism
for equipment shutdown planning using a developed integer programming model. The proposed
mechanism effectively provides valuable recommendations for the managements of wafer fabs regarding
the type and quantity of equipment to shut down.
Keywords
Tool portfolio , Cost reduction , Semiconductor , Capacity Planning
Journal title
Computers & Industrial Engineering
Serial Year
2010
Journal title
Computers & Industrial Engineering
Record number
925997
Link To Document