Title of article
A simple and robust Simulated Annealing algorithm for scheduling workover rigs on onshore oil fields
Author/Authors
Glaydston Mattos Ribeiro، نويسنده , , b، نويسنده , , ?، نويسنده , , Geraldo Regis Mauri c، نويسنده , , 1، نويسنده , , Luiz Antonio Nogueira Lorena، نويسنده , , 2، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2011
Pages
8
From page
519
To page
526
Abstract
Onshore oil wells are dependent of maintenance services such as cleaning, reinstatement and stimulation.
These services can be performed by a limited number of workover rigs. Usually, wells need maintenance
services and a scheduling of the workover rigs must be defined. This scheduling must consider
some factors such as the well production, the type of service to be performed and time windows for
the service. There is a production loss associated to wells waiting for maintenance services, so it is important
to attend them as soon as possible. Thus, the workover rig scheduling problem consists of finding the
best schedule for the limited number of workover rigs, minimizing the production loss associated with
the wells waiting for maintenance service. We present a simple and robust Simulated Annealing (SA)
algorithm for solving this problem. Computational results on real problems obtained in Brazil are
reported and SA presents better solutions than all those approaches reported in the literature.
Keywords
Workover rigs , Simulated annealing , Oil production
Journal title
Computers & Industrial Engineering
Serial Year
2011
Journal title
Computers & Industrial Engineering
Record number
926074
Link To Document