• Title of article

    Two-stage no-wait scheduling models with setup and removal times separated

  • Author/Authors

    J. N. D. Gupt، نويسنده , , V. A. Strusevich، نويسنده , , C. M. Zwaneveld، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 1997
  • Pages
    7
  • From page
    1025
  • To page
    1031
  • Abstract
    This paper studies two models of two-stage processing with no-wait in process. The first model is the two-machine flow shop, and the other is the assembly model. For both models we consider the problem of minimizing the makespan, provided that the setup and removal times are separated from the processing times. Each of these scheduling problems is reduced to the Traveling Salesman Problem (TSP). We show that, in general, the assembly problem is NP-hard in the strong sense. On the other hand, the two-machine flow shop problem reduces to the Gilmore-Gomory TSP, and is solvable in polynomial time. The same holds for the assembly problem under some reasonable assumptions. Using these and existing results, we provide a complete complexity classification of the relevant two-stage no-wait scheduling models.
  • Journal title
    Computers and Operations Research
  • Serial Year
    1997
  • Journal title
    Computers and Operations Research
  • Record number

    926885