• Title of article

    A newsboy problem with reactive production

  • Author/Authors

    Chia-Shin Chung، نويسنده , , James Flynn، نويسنده ,

  • Issue Information
    دوهفته نامه با شماره پیاپی سال 2001
  • Pages
    15
  • From page
    751
  • To page
    765
  • Abstract
    This paper extends the classic newsboy problem by introducing reactive production. Production occurs in two stages, a anticipatory stage and a reactive stage. In the anticipatory stage, one determines a production level that anticipates the demand, all of which occurs in the reactive stage. There production takes place with full knowledge of the actual demand and, thus, can react to it. The reactive stage contains multiple sources of capacitated production. Demand is continuous and stochastic, and production, holding, and shortage costs are proportional. There are no fixed costs. Shortages are lost. Our model reduces to a single-period model with piecewise-linear convex costs. We obtain an analogue of the well-known critical fractile formula of the classic newsboy model. We also undertake a numerical study that compares our model with (i) the classic newsboy model, and (ii) a model which employs reactive production but uses classic newsboy formulas. Extensive computational experiments with normal demand problems suggest that the costs under our model can be substantially less than the costs under (i) and (ii).
  • Keywords
    Inventory , Single period , Newsboy , Stochastic
  • Journal title
    Computers and Operations Research
  • Serial Year
    2001
  • Journal title
    Computers and Operations Research
  • Record number

    927165