    A high-performance exact method for the resource-constrained project scheduling problem

  • Author/Authors

    M. Reza Zamani، نويسنده ,

  • Issue Information
    دوهفته نامه با شماره پیاپی سال 2001
  • Pages
    15
  • From page
    1387
  • To page
    1401
  • Abstract
    This paper describes an efficient exact algorithm for project scheduling with resource constraints. The procedure consists of creating partial schedules which are always feasible with respect to both precedence and resource constraints. These partial schedules are connected through a tree, and a lower bound on the completion of the uncompleted activities is associated with each partial schedule. The branching process takes place from a partial schedule with the minimum lower bound and continues until the optimal schedule is created. Despite branching from a partial schedule with the minimum lower bound, the algorithm does not need large memory for keeping partial schedules as independent data, and does not require large comparability time for selecting a partial schedule to branch from. These make it possible to solve test problems each involving up to 100 activities and six different resource types. The computational results of the performance of the algorithm are reported.
  • Keywords
    Project scheduling , Combinatorial optimization , branch-and-bound , Heuristics
  • Journal title
    Computers and Operations Research
  • Serial Year
    2001
  • Journal title
    Computers and Operations Research
  • Record number

    927203