    Fast parallel heuristics for the job shop scheduling problem

  • Author/Authors

    K. Steinh?fel، نويسنده , , A. Albrecht، نويسنده , , C. K. Wong، نويسنده ,

  • Issue Information
    دوهفته نامه با شماره پیاپی سال 2002
  • Pages
    19
  • From page
    151
  • To page
    169
  • Abstract
    The paper is dealing with parallelized versions of simulated annealing-based heuristics for the classical job shop scheduling problem. The scheduling problem is represented by the disjunctive graph model and the objective is to minimize the length of longest paths. The problem is formulated for l jobs where each job has to process exactly one task on each of the m machines. The calculation of longest paths is the critical computation step of our heuristics and we utilize a parallel algorithm for this particular problem where we take into account the specific properties of job shop scheduling. In our heuristics, we employ a neighborhood relation which was introduced by Van Laarhoven et al. (Operations Research 40(1) (1992) 113–25). To obtain a neighbor, a single arc from a longest path is reversed and these transition steps always guarantee the feasibility of schedules. We designed two cooling schedules for homogeneous Markov chains and additionally we investigated a logarithmic cooling schedule for inhomogeneous Markov chains. Given O(n3) processors and a known upper bound Λ=Λ(l,m) for the length of longest paths, the expected run-times of parallelized versions are View the MathML source for the first cooling schedule and View the MathML source for the second cooling schedule, where n=lm is the number of tasks. For the logarithmic cooling schedule, a speed-up of View the MathML source can be achieved. When Markov chains of constant length are assumed, we obtain a polylogarithmic run-time of View the MathML source for the first cooling schedule. The analysis of famous benchmark problems led us to the conjecture that Λ⩽O(l+m) could be a uniform upper bound for the completion time of job shop scheduling problems with l jobs on m machines. Although the number of processors is very large, the particular processors are extremely simple and the parallel processing system is suitable for hardware implementations.
  • Keywords
    Parallel algorithms , Simulated annealing , Benchmark problems , Job shop scheduling , Combinatorial optimization
  • Journal title
    Computers and Operations Research
  • Serial Year
    2002
  • Journal title
    Computers and Operations Research
  • Record number

    927215