Title of article
Single hoist cyclic scheduling with multiple tanks: a material handling solution
Author/Authors
Zhili Zhou، نويسنده , , Ling Li، نويسنده ,
Issue Information
دوهفته نامه با شماره پیاپی سال 2003
Pages
9
From page
811
To page
819
Abstract
A hoist controlled by a computer is widely used for moving electroplates which is chemically treated in a sequence of tanks. The hoist scheduling directly affects the throughput of a production system. The objective of the hoist scheduling problem is to schedule the moves to maximize the throughput. This paper investigates the hoist scheduling problem, a specific material handling issue, in a manufacturing environment. The scope of the study is in the area of single hoist cyclic scheduling with multiple tanks. The purpose of the study is to develop a mixed integer linear programming model that can be used to schedule multiple tanks and improve throughput in a process industry. Specifically, a method has been proposed to estimate the processing time in a bottleneck stage with multiple tanks.
Keywords
Bottleneck control , Industrial Engineering , Operations management , manufacturing processes , material handling , Mixed Integer Linear Programming , Hoist scheduling problem
Journal title
Computers and Operations Research
Serial Year
2003
Journal title
Computers and Operations Research
Record number
927382
Link To Document