• Title of article

    Single hoist cyclic scheduling with multiple tanks: a material handling solution

  • Author/Authors

    Zhili Zhou، نويسنده , , Ling Li، نويسنده ,

  • Issue Information
    دوهفته نامه با شماره پیاپی سال 2003
  • Pages
    9
  • From page
    811
  • To page
    819
  • Abstract
    A hoist controlled by a computer is widely used for moving electroplates which is chemically treated in a sequence of tanks. The hoist scheduling directly affects the throughput of a production system. The objective of the hoist scheduling problem is to schedule the moves to maximize the throughput. This paper investigates the hoist scheduling problem, a specific material handling issue, in a manufacturing environment. The scope of the study is in the area of single hoist cyclic scheduling with multiple tanks. The purpose of the study is to develop a mixed integer linear programming model that can be used to schedule multiple tanks and improve throughput in a process industry. Specifically, a method has been proposed to estimate the processing time in a bottleneck stage with multiple tanks.
  • Keywords
    Bottleneck control , Industrial Engineering , Operations management , manufacturing processes , material handling , Mixed Integer Linear Programming , Hoist scheduling problem
  • Journal title
    Computers and Operations Research
  • Serial Year
    2003
  • Journal title
    Computers and Operations Research
  • Record number

    927382