• Title of article

    Scheduling parallel machines by the dynamic newsboy problem

  • Author/Authors

    Konstantin Kogan، نويسنده ,

  • Issue Information
    دوهفته نامه با شماره پیاپی سال 2004
  • Pages
    15
  • From page
    429
  • To page
    443
  • Abstract
    This paper focuses on a dynamic, continuous-time generalization of the single period newsboy problem. Similar to the classical newsboy problem, the model may represent the inventory of an item that becomes obsolete quickly, spoils quickly, or has a future that is uncertain beyond a single period. The problem is characterized by a number of newsboys (machines) whose operations are organized and controlled in parallel. The objective is to minimize shortage and surplus costs occurring at the end of the period as in the classical newsboy problem, as well as intermediate production and surplus costs that are incurred at each time point along the period. We prove that this continuous-time problem can be reduced to a number of discrete-time problems which are determined by loose, balanced and pressing production conditions. As a result, a polynomial-time combinatorial algorithm is derived in order to find globally optimal solutions.
  • Journal title
    Computers and Operations Research
  • Serial Year
    2004
  • Journal title
    Computers and Operations Research
  • Record number

    928029