Title of article
Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs
Author/Authors
Satyaki Ghosh Dastidar، نويسنده , , Rakesh Nagi، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2005
Pages
19
From page
2987
To page
3005
Abstract
This paper addresses a production scheduling problem in an injection molding facility. It appears to be the first attempt to schedule parallel machines for multiple items in presence of multiple capacitated resource constraints with sequence-dependent setup costs and times. The objective is to meet customer demands while minimizing the total inventory holding costs, backlogging costs and setup costs. We present a mathematical formulation of the problem. The computational complexity associated with the formulation makes it difficult for standard solvers address industrial-dimensioned problems in reasonable solution time. To overcome this, a two-phase workcenter-based decomposition scheme has been developed in this paper. The computational results for different problem sizes demonstrate that this scheme is able to solve industrial-dimensioned problems within reasonable time and accuracy.
Keywords
Scheduling , Multiple capacitated resources , Sequence-dependent setup , Changeover cost
Journal title
Computers and Operations Research
Serial Year
2005