• Title of article

    An exact method for problem

  • Author/Authors

    Rabia Nessah، نويسنده , , Chengbin Chu، نويسنده , , Farouk Yalaoui، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2007
  • Pages
    9
  • From page
    2840
  • To page
    2848
  • Abstract
    This paper addresses an identical parallel machine scheduling problem, with sequence-dependent setup times and release dates to minimize total completion time. This problem is known to be strongly NP-hard. We prove a sufficient and necessary condition for local optimality which can also be considered as a priority rule. We then define a dominant subset based on this condition. We present efficient heuristic algorithms using this condition to build a schedule belonging to this subset. We also prove dominance theorem, and develop a lower bound that can be computed in polynomial time. We construct a branch-and-bound algorithm in which the heuristic, the lower bound and the dominance properties are incorporated. Computational experiments suggest that the algorithm can handle test problems with 40 jobs and 2 machines.
  • Keywords
    Shortest paths , Bellman equations , Directed acyclic graph
  • Journal title
    Computers and Operations Research
  • Serial Year
    2007
  • Journal title
    Computers and Operations Research
  • Record number

    928498