• Title of article

    Single-machine scheduling with an availability constraint to minimize the weighted sum of the completion times

  • Author/Authors

    Imed Kacem، نويسنده , , Chengbin Chu، نويسنده , , Ahmed Souissi، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2008
  • Pages
    18
  • From page
    827
  • To page
    844
  • Abstract
    In this article, we consider a single-machine scheduling problem with one unavailability period, with the aim of minimizing the weighted sum of the completion times. We propose three exact methods for solving such a problem: a branch-and-bound method based on new properties and lower bounds, a mixed integer programming model, and a dynamic programming method. These methods were coded and tested on randomly generated instances, and their performances were analyzed. Our numerical experiments show that the branch-and-bound method and the dynamic programming method are complementary. Using these approaches, we are able to solve problems with up to 3000 jobs within a reasonable computation time.
  • Keywords
    Branch and Bound , Integer programming , Scheduling , Availability constraint , Dynamic programming
  • Journal title
    Computers and Operations Research
  • Serial Year
    2008
  • Journal title
    Computers and Operations Research
  • Record number

    928621