Title of article
Scheduling with flexible resources in parallel workcenters to minimize maximum completion time
Author/Authors
Alex J. Ruiz-Torres، نويسنده , , Grisselle Centeno، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2007
Pages
22
From page
48
To page
69
Abstract
In this paper we consider the parallel machine scheduling problem with dual resource constraints with the objective of minimizing the maximum completion time. We develop heuristics that combine list-scheduling and bin-packing approaches with rules to iteratively modify the flexible resource allocation. A lower bound is presented and the previous and proposed solution approaches to the problem are analyzed under a variety of experimental conditions, demonstrating that there are advantages to the proposed heuristics.
Keywords
Makespan , Maximum completion time , Dual resource scheduling , Parallel machines scheduling
Journal title
Computers and Operations Research
Serial Year
2007
Journal title
Computers and Operations Research
Record number
928844
Link To Document