• Title of article

    Scenario planning for electricity supply

  • Author/Authors

    W Soontornrangson، نويسنده , , D.G. Evans، نويسنده , , R.J. Fuller، نويسنده , , D.F Stewart، نويسنده ,

  • Issue Information
    دوهفته نامه با شماره پیاپی سال 2003
  • Pages
    13
  • From page
    1647
  • To page
    1659
  • Abstract
    Electricity generating systems using conventional electricity planning usually face demand-supply mismatch problems resulting from erroneous forecasting of the demand for electricity. Model simulation was used to investigate whether scenario planning would reduce such problems. It was found that scenario planning has the potential of reducing the cost of generating electricity by up to US$3000 million over a 15-year planning period for a medium-size supply system such as that of Thailand.
  • Keywords
    Scenario planning , Electricity supply construction plan , Electricity planning
  • Journal title
    Energy Policy
  • Serial Year
    2003
  • Journal title
    Energy Policy
  • Record number

    969402