• Title of article

    Network investments and the integration of distributed generation: Regulatory recommendations for the Dutch electricity industry

  • Author/Authors

    Eva Niesten، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2010
  • Pages
    8
  • From page
    4355
  • To page
    4362
  • Abstract
    An increase in the distributed generation of electricity necessitates investments in the distribution network. The current tariff regulation in the Dutch electricity industry, with its ex post evaluation of the efficiency of investments, average benchmarking and a frontier shift in the x-factor, delays these investments. In the unbundled electricity industry, the investments in the network need to be coordinated with those in the distributed generation of electricity to enable the system operators to build enough network capacity. The current Dutch regulations do not provide for a sufficient information exchange between the generators and the system operators to coordinate the investments. This paper analyses these two effects of the Dutch regulations, and suggests improvements to the regulation of the network connection and transportation tariffs to allow for sufficient network capacity and coordination between the investments in the network and in the generation of electricity. These improvements include locally differentiated tariffs that increase with an increasing concentration of distributed generation.
  • Keywords
    Network investments , Distributed electricity generation , Regulation
  • Journal title
    Energy Policy
  • Serial Year
    2010
  • Journal title
    Energy Policy
  • Record number

    969909