• Title of article

    Generation adequacy and transmission interconnection in regional electricity markets

  • Author/Authors

    Mauricio Cepeda، نويسنده , , Marcelo Saguan، نويسنده , , Dominique Finon، نويسنده , , Virginie Pignon، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2009
  • Pages
    11
  • From page
    5612
  • To page
    5622
  • Abstract
    The power system capacity adequacy has public good features that cannot be entirely solved by electricity markets. Regulatory intervention is then necessary and established methods have been used to assess adequacy and help regulators to fix this market failure. In regional electricity markets, transmission interconnections play an important role in contributing to adequacy. However, the adequacy problem and related policy are typically considered at a national level. This paper presents a simple model to study how the interconnection capacity interacts with generation adequacy. First results indicate that increasing interconnection capacity between systems improves adequacy up to a certain level; further increases do not procure additional adequacy improvements. Furthermore, besides adequacy improvement, increasing transmission capacity under asymmetric adequacy criteria or national system characteristics could create several concerns about externalities. These results imply that regional coordination of national adequacy policies is essential to internalise adequacy of cross-border effects.
  • Keywords
    Capacity adequacy , Interconnection , Regional power markets
  • Journal title
    Energy Policy
  • Serial Year
    2009
  • Journal title
    Energy Policy
  • Record number