شماره ركورد كنفرانس
4191
عنوان مقاله
Modeling of Tardiness and Earliness Problem on Single Machine Cyclic Mass Production
پديدآورندگان
Moradi V vahed.moradi@ymail.com Department of Industrial Engineering , Bonab Branch, Islamic Azad University, Bonab, Iran , Pourghadim V.A Department of Industrial Engineering , Bonab Branch, Islamic Azad University, Bonab, Iran
تعداد صفحه
9
كليدواژه
Tardiness , earliness cost , Cyclic production , Mass production , Sequencing
سال انتشار
1394
عنوان كنفرانس
دوازدهمين كنفرانس بين المللي مهندسي صنايع
زبان مدرك
انگليسي
چكيده فارسي
In this paper, a new programming model was proposed for the first time to find the entrance sequence of different parts of a machine in order to minimize the Tardiness and Earliness costs on 1- Machine Cyclic Mass Production Problem. The model is formulated according to the assumption of the cyclic production and its continuity over time, and also taking into account the different due date of the parts on this cycle. Also, before programming model, an accurate heuristic algorithm was described to better understand the model that more formally track the performance of these models.
كشور
ايران
لينک به اين مدرک