• DocumentCode
    1020684
  • Title

    Facilities for the Supply of Kilowatts and Kilovars

  • Author

    Sels, Hollis K. ; Seely, Theodore

  • Author_Institution
    Transmission and substation engineer, Electric department of the Public Service Electric and Gas Company, Newark, N. J.
  • Volume
    61
  • Issue
    5
  • fYear
    1942
  • fDate
    5/1/1942 12:00:00 AM
  • Firstpage
    249
  • Lastpage
    255
  • Abstract
    Increased system kilowatt capacity may be realized by the reduction of generator kilovar requirements and the provision of reactive capacity sources at other points in the system. The factors to be considered in the choice of various reactive sources are discussed. Benefits to be realized from the various reactive sources are described. The paper is based upon system plan studies of a large eastern utility.
  • Keywords
    Capacity planning; Centralized control; Character generation; Circuit faults; Frequency; Power generation; Thermal loading; Thermal stability; Turbines; Voltage;
  • fLanguage
    English
  • Journal_Title
    American Institute of Electrical Engineers, Transactions of the
  • Publisher
    ieee
  • ISSN
    0096-3860
  • Type

    jour

  • DOI
    10.1109/T-AIEE.1942.5058523
  • Filename
    5058523