DocumentCode
1020684
Title
Facilities for the Supply of Kilowatts and Kilovars
Author
Sels, Hollis K. ; Seely, Theodore
Author_Institution
Transmission and substation engineer, Electric department of the Public Service Electric and Gas Company, Newark, N. J.
Volume
61
Issue
5
fYear
1942
fDate
5/1/1942 12:00:00 AM
Firstpage
249
Lastpage
255
Abstract
Increased system kilowatt capacity may be realized by the reduction of generator kilovar requirements and the provision of reactive capacity sources at other points in the system. The factors to be considered in the choice of various reactive sources are discussed. Benefits to be realized from the various reactive sources are described. The paper is based upon system plan studies of a large eastern utility.
Keywords
Capacity planning; Centralized control; Character generation; Circuit faults; Frequency; Power generation; Thermal loading; Thermal stability; Turbines; Voltage;
fLanguage
English
Journal_Title
American Institute of Electrical Engineers, Transactions of the
Publisher
ieee
ISSN
0096-3860
Type
jour
DOI
10.1109/T-AIEE.1942.5058523
Filename
5058523
Link To Document