DocumentCode
1040256
Title
Electrical Design and Operating Experience with the Pinnacles Waste Heat Gas Turbine Plant
Author
Stine, Clifford E.
Author_Institution
Southern California Edison Company
Issue
6
fYear
1970
fDate
7/1/1970 12:00:00 AM
Firstpage
1271
Lastpage
1276
Abstract
The installation of a dual-energy plant to provide exhaust heat to a chemical plant and electricity for the plant and other area loads in a severe high-temperature, dust-laden environment is described in this paper. Of interest are the electrical and mechanical features and operating experience to date for the 15-megawatt nominal-rated gas turbine generator set which was derated due to high ambient desert temperature conditions. Increased insulation levels were specified for all outdoor electrical equipment.
Keywords
Ash; Boilers; Chemicals; Heat recovery; Lakes; Packaging; Power transmission lines; Resistance heating; Turbines; Waste heat;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1970.292742
Filename
4074196
Link To Document