DocumentCode
1046775
Title
Hydroelectric Development of the Saguenay River The Duke-Price Power Company, Ltd., at Isle Maligne, Quebec, Canada
Author
Lee, W.S.
Author_Institution
Southern Power Co., Charlotte, N.C.
fYear
1925
Firstpage
722
Lastpage
736
Abstract
The building of the Isle Maligne Station in a remote section with extreme difficulties due to weather and floods, called for very careful planning and coordination of the various parts of the work. The steps in the construction of this plant are shown perhaps at rather extreme length, but this is done largely to bring out the value and importance of designing with the idea of cooperating and coordinating with the contractor or the construction forces. The design and layout of the construction plant were given as much attention on this work as the design of the powerhouse. The writer maintains and endeavors to impress upon designing and construction engineers of any large project, this very important cooperative feature. Had this not been done at the Isle Maligne Station, the great amount of work could never have been executed in the same length of time.
Keywords
Design engineering; Fault location; Floods; Lakes; Maintenance engineering; Power engineering and energy; Rivers; Water storage;
fLanguage
English
Journal_Title
American Institute of Electrical Engineers, Transactions of the
Publisher
ieee
ISSN
0096-3860
Type
jour
DOI
10.1109/T-AIEE.1925.5061161
Filename
5061161
Link To Document