• DocumentCode
    1105111
  • Title

    Criteria for phase-to-phase clearances of HV substations

  • Author

    Panek, J. ; Sublich, M. ; Elahi, H.

  • Author_Institution
    GE Ind. & Utility Sales, Schenectady, NY, USA
  • Volume
    5
  • Issue
    1
  • fYear
    1990
  • fDate
    1/1/1990 12:00:00 AM
  • Firstpage
    137
  • Lastpage
    143
  • Abstract
    To facilitate uprating of HV substations, a reexamination is made of line-to-line insulation design criteria. The basis for existing practices and the principles of line-to-line lightning surge overvoltage stresses are reviewed. Results of a digital study for a realistic substation are presented. The conclusions show that the line-to-line stresses, as limited by surge arresters, are substantially higher than line-to-ground stresses. This represents increased requirements as compared to existing standards. However, due to the low protective levels of modern arresters, substantial reduction of line-to-line clearances is still feasible
  • Keywords
    lightning protection; overvoltage; substations; surge protection; HV substations; lightning surge overvoltage stresses; line-to-line insulation design criteria; phase-to-phase clearances; surge arresters; Arresters; Flashover; Insulation; Lightning; Marketing and sales; Senior members; Stress; Substations; Surge protection; Voltage control;
  • fLanguage
    English
  • Journal_Title
    Power Delivery, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8977
  • Type

    jour

  • DOI
    10.1109/61.107266
  • Filename
    107266