• DocumentCode
    1142114
  • Title

    An aggregate model of project-oriented production

  • Author

    Hackman, Steven T. ; Leachman, Robert C.

  • Author_Institution
    Sch. of Ind. & Syst. Eng., Georgia Inst. of Technol., Atlanta, GA, USA
  • Volume
    19
  • Issue
    2
  • fYear
    1989
  • Firstpage
    220
  • Lastpage
    231
  • Abstract
    A production system is studied in which thousands of activities are carried out concurrently subject to precedence constraints and limitations on resources such as skilled labor and equipment. Ideally, management proposes a set of milestone dates, obtains an analysis of which milestones cannot be met, and determines which resources are underused or overused. This process continues interactively until milestones consistent with management´s objectives are obtained. The authors derive, from elementary principles and basic assumptions (axioms), a continuous-time model of project execution of an aggregate level of detail. The model is approximated using a set of linear inequalities. This data structure can be manipulated easily and quickly by methods of linear programming to perform the required analysis
  • Keywords
    management science; operations research; production control; project engineering; aggregate model; continuous-time model; data structure; linear inequalities; linear programming; management; production control; production system; project engineering; project-oriented production; Aggregates; Data structures; Job shop scheduling; Linear programming; Marine vehicles; Performance analysis; Production systems; Productivity; Project management; Resource management;
  • fLanguage
    English
  • Journal_Title
    Systems, Man and Cybernetics, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9472
  • Type

    jour

  • DOI
    10.1109/21.31028
  • Filename
    31028