• DocumentCode
    1163157
  • Title

    Progress Report on a Guide for Loading Oil-Immersed Power Transformers Rated in Excess of 100 MVA

  • Author

    Committee, I.T.

  • Issue
    8
  • fYear
    1981
  • Firstpage
    4020
  • Lastpage
    4032
  • Abstract
    The development of a loading guide for large power transformers was considered by the IEEE Transformers Committee on the basis of special problems inherent in large transformers. This paper addresses some of these special problems, such as risk, types of loading, temperature limitations, and user specification, and it discusses the reasons behind features found in the proposed guide. The basis for many of the changes that have been developed here are related to the results of recent research projects and the extensive computer facilities now available to users.
  • Keywords
    Cooling; Dielectrics and electrical insulation; Insulation life; Manufacturing; Mechanical factors; Power transformer insulation; Power transformers; Temperature; Thermal factors; Thermal stresses;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1981.316997
  • Filename
    4111093