DocumentCode
1170829
Title
Hydrothermal Economic Scheduling Part IV. A Continuous Procedure for Maximizing the Weighted Output of a Hydroelectric Generating Station
Author
Bernholtz, B. ; Graham, L.J.
Volume
80
Issue
3
fYear
1961
fDate
4/1/1961 12:00:00 AM
Firstpage
1105
Lastpage
1107
Abstract
The derivative of the function relating maximum station output to station discharge is discontinuous at certain points. The attendant difficulties in maximizing weighted hydro output were avoided in Part I by using a maximizing procedure based on tabulated values of output and discharge. Here an alternative procedure is presented. Maximum station output is approximated by a concave differential function of discharge. In maximizing weighted hydro output, the derivative plays an essential role and any physically possible discharge is permitted.
Keywords
Cost function; Equations; Fuel economy; Hydroelectric power generation; Job shop scheduling; Lagrangian functions; Power generation economics; Power system dynamics; Power system economics; Propagation losses;
fLanguage
English
Journal_Title
Power Apparatus and Systems, Part III. Transactions of the American Institute of Electrical Engineers
Publisher
ieee
ISSN
0097-2460
Type
jour
DOI
10.1109/AIEEPAS.1961.4501221
Filename
4501221
Link To Document