• DocumentCode
    1173755
  • Title

    Public Notification System Design Aided By Actual Measurements Of Siren Coverage

  • Author

    Tepper, G.David ; Schaumberg, P.Leslie ; Homans, Brian L. ; Anderson, Marvin

  • Author_Institution
    Philadelphia Electric Company
  • Issue
    9
  • fYear
    1983
  • Firstpage
    3184
  • Lastpage
    3188
  • Abstract
    Renewed interest in the effectiveness of public notification systems has been stimulated by the Nuclear Regulatory Commission´s (NRC) requirement for public notification around each nuclear power plant. Power utilities throughout the country have taken different approaches to try to comply with the NRC´s requirement. Philadelphia Electric Company (PECO) took a direct approach and evaluated the effectiveness of a siren´s coverage which provided guidance to finalization of a public notification system design.
  • Keywords
    Acoustic testing; Area measurement; Atomic measurements; Costs; Electric variables measurement; Nuclear measurements; Power generation; Power measurement; Sea measurements; Telephony;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1983.318127
  • Filename
    4112330